• Build Better

  • How long will it take to build?

    After you receive a building permit, the Butler Building material typically takes about 12 weeks to arrive on your site. During that time, your foundations and floor slab should be completed and ready for the Butler building. Erection of the building depends on the size but is much faster than conventional block construction.

    Comments are closed.